6
3. Using installer supplied 18AWG stranded wire, connect
transmitter’s 9th terminal from left on J4 to ‘R’ terminal
on transfer switch control board (J7, 3rd terminal from
left).
4. Using installer supplied 18AWG stranded wire, connect
transmitter’s rightmost J4 terminal to ‘+V’ terminal on
transfer switch control board (J7, rightmost terminal).
5. Using installer supplied 18AWG stranded wire, run
sufficient length of a pair of wires through conduit from
transfer switch to generator. Connect ‘GND’ terminal on
transfer switch control board (J8, left terminal) to wire
harness attached to generator control panel at
‘TxRxGND’ position (5th terminal down from top)
6. Using second wire run in 5. above, connect ‘T/S’
terminal on transfer switch control board (J8, right
terminal) to wire harness attached to generator control
panel at ‘TxRx’ position (4th terminal down from top)
7. Install three (3) AA batteries in transmitter. Observe
battery polarity.
This completes the StatStation transmitter installation.
Extra Current Transformers were supplied in the event the
home standby system has a Power Management System
already installed. Review the Power Management System
installation instructions to ensure all connections associated
with that system have not been disturbed.
Display Console Installation
1. Find an indoor location for the display console that is
convenient for both viewing status reports and
receiving audible alarms. The location must be within
200 ft (61 m) of the transmitter and have a nearby
electrical receptacle.
2. Insert four (4) AA batteries into the back of the display
console.
3. Attach the AC/DC adapter to the display console and
plug it into the electrical receptacle.
4. Follow the instructions given under Setting Up Your
StatStation in the Operation section.
Comentários a estes Manuais